Retrofit steam boiler at Perlen Papier

Sustainable innovation and increased efficiency for the future of paper production. A boiler that was decommissioned around 10 years ago has been reactivated and is being used for steam production again.

Perlen Papier AG, a leading family business and Switzerland's number one manufacturer of high-quality magazine and press papers, has extensively refurbished its steam boiler, which has been out of operation for around ten years, and put it back into operation

Rey Technology carried out the retrofit on the steam boiler and acted as general contractor (GC), coordinating the subcontractors. The refurbishment comprised several important steps. Firstly, all the necessary documents were obtained to ensure functionality, including a risk analysis and SIL classification. The flue gas routing was fundamentally redesigned by dismantling the existing catalytic converter and adapting the turning chambers to route the flue gases through the 3-pass boiler in the classic way.

In addition, the old smooth-tube Eco was replaced with a new Eco from Ecotherm, which led to a reduction in flue gas losses. The flue pipes in the third flue were replaced, including the necessary locksmith and welding work as well as X-ray inspections and pressure tests. All boiler fittings and seals were checked or replaced. The old burner was replaced by a modern Saacke burner with electronic control. A new gas line and supply line were also installed.

 

The excellent collaboration with the Perlen Papier project team contributed significantly to the success of the project. Thanks to careful planning and implementation, the steam boiler was put back into operation on schedule. This represents significant progress for steam production at Perlen Papier and underlines the company's innovative strength and ecological responsibility.

"The collaboration with Rey Technology in connection with the project was very pleasant and goal-oriented from start to finish. The high level of expertise helped in particular with the planning and development of the sub-steps, including compliance with environmental aspects such as flue gas emissions, operational and plant safety. The precise coordination of the project steps and their implementation right through to project completion ensured 100% target achievement.

The company Rey Technology was recommended to us. Based on our positive experience in this project, we are happy to recommend Rey Technology to others."

Pierre Nydegger, specialist in energy management at Perlen Papier AG

Boiler control (Rey)

  • SIEMENS SIMATIC S7 1514SP F incl. Comfort Panel

Burner control (Saacke)

  • Se@vis FSC fail-safe control unit incl. HMI

Communication

  • PROFINET / MODBUS TCP

Corner data

  • Content: 46,000.0 liters
  • Operating pressure: 18.5 bar
  • Burner output MAX: Natural gas 20 MW / heating oil 17.5 MW

Achievements of Rey

  • Function as general contractor for all trades and budget monitoring
  • Safeguarding and coordination of subcontractors, scheduling of the construction site
  • Drawing up the execution concept
  • Conducting the risk analysis and SIL classification in collaboration with the operator
  • Delivery of the safety equipment
  • Project management in accordance with EN50156 incl. SIL verification
  • Functional description
  • Create new electrical diagram with Eplan P8
  • Fabrication, delivery and assembly of new control cabinets
  • Electrical installation
  • Replacement of the boiler control system; software engineering PLC and visualization
  • Function test
  • Training on site
  • Acceptance with the external inspection bodies (SVTI and eco swiss)